The bathroom demolition was a little more tricky. All the plumbing had to be temporary capped off and they had to inspect for damage to the floors. (thank goodness there was none) That was not in the budget....... With the vanity torn out and the countertop and medicine cabinet gone, it was on to removing the old flooring (it was only two layers......that was a treat). Then it was time to remove the wall that seperated the vanity area from the water closet and shower area. That automatically gave us another 6-7 inches of space in this bathroom. That is great for this growing family.